Company Reviews

    Reviews

    We don't have enough reviews for Philippine Tonan Corporation yet to show an average rating.

    Have your say

    Let others know what it's like to work at Philippine Tonan Corporation.Write a review

    Reviews

    Showing 2 reviews sorted by most recent
    Sort by
    most recent
    5.0
    Maintenance Technician
    Apr 2026
    Mactan Lapu-Lapu City Cebu8 to 9 years in the role, former employee
    Good experience on industry and having good relation with the people hat surround me
    The good thingsI enjoy on troubleshooting of gantry cranes. operating of boilers and electrical jobs.
    The challengesTroubleshooting so that no downtime of the production.
    1.0
    CNC OPERATOR
    Jul 2022
    Production assembly Job Description: 1.PRODUCTION COORDINATOR • Preparing production schedule • Data encoder • Data Filling Job Orders • Procurement Request Local / Export Material need the factory. • Ensuring all stock and inventory is labeled correctly in the production • Labor Relations • Communicating and coordinating with other departments and Sales & customers. • Factory output update in lab control file in Excel sheet. • Maintaining log control (Hardware, Metal Sheet, Dayton). Request • Preparing MRP (Material Received from Production) in ERP SAP System. • Preparing Manual & System Generated GRN for shipments: Local & Foreign Purchases. • Identify areas of improvement and adjust existing work procedures and practices and rectify any constraint in Production management system. • Maintain items record, document necessary information and utilize reports to project Production & warehouse status. 2.CNC PRESS BRAKE BENDING MACHINE OPERATOR • Clean first the working placed area before starting the work. • Check the machine if a good condition before running the machine • Check the all program before running the machine • Check the die and punch according to thickness of the material sheet required • First try to bend one-piece for the sample, and check if good or not dimension require as mentioned in the fabrication drawing before to start the mass productions • Check the punched and die parts if this is required for the machine programed, as per the fabrication drawings. • Retrieve the correct as per thickness of material to bend. • Bend parts as per required profile as mentioned in the fabrication drawings. • Check dimension and angels of profile at various stages • While bending parts with louvers, Emboss and countersink be sure to position the formed shape on the inside of profile • If one job order completed means, make tag on tap of the finished parts in each pallet • Clean the machine and work area once the job is completed 3.CNC DECOILER SHEARING CUTTING MACHINE • Clean first the working placed area before starting the work • Check the machine if a good condition before running the machine • Check the all program before starting the machine • Set up the coil sheet metal to the De coiler roller • Try to cut one sheet metal and check length and dimensions required • Identify the coils required material thickness and dimensions • Set the machine to cut the required thickness and dimensions • Start the shearing process as per required dimensions • Check sheared parts at various stages • mention the quantity count in each sheet after shear completed • Be sure to shear as per required quantity • Identify the sheared part like tag SKU number thickness and dimension • Clean the machine and work area once the job is completed
    The good thingsI enjoy with coworker
    The challengeshard work and discipline
    Company Reviews published on our site are the views and opinions of their authors and do not represent the views and opinions of Jobstreet or its personnel. Jobstreet does not verify the truth or accuracy of any reviews and does not adopt or endorse any of the comments posted. Jobstreet posts reviews for what they are worth and for informational purposes only to assist candidates to find employment.